RENOVATING FORMER INDIANAPOLIS VA HOSPITAL
All Posts


October 2026
PROGRESS Finishing up bathroom tile and beginning painting Adding windows to chapel space Continuing work in the lobby Preparing mechanical room for equipment Preparing exterior for generator and transformer
Oct 301 min read


September 2026
PROGRESS Now that demolition of Buildings 8 and 40 is complete, work can be completed on the north end of Building 1 and the connector to restore those masonry walls. Work in the corridors continues, including repairs to walls, installation of piping and ductwork, and installation of ceiling grid. Tile in the restrooms is also ongoing.
Sep 251 min read


August 2026
PROGRESS Restroom and water fountain wall and floor tile Complete site water Completed cupola Hydronic piping rough-ins Drywall hanging and finishing Under slab plumbing rough-ins Electrical panels and equipment Setting chilled beam units UPCOMING WORK Interior prime and first coat painting Terrazzo restoration Sanitary lateral
Aug 51 min read


July 2026
PROGRESS Completed sanitary lining repairs Site water Hydronic piping rough-ins Generator and transformer under slab rough-ins Drywall hanging and finishing Plaster patching UPCOMING WORK Restroom wall and floor tile Cupola painting Under slab plumbing rough-ins Interior prime and first coat painting Terrazzo restoration
Jul 71 min read